info@sproduct.com.ua (044) 360-00-88

Ivankivska TPP

Ivankivska TPP

Construction of Ivankivska biomass TPP.

Project Details


The first in Ukraine project for the construction of TPPs on alternative fuels (biomass: wood chips, agricultural wastes, etc.) for 6 MW of electric energy (first stage) + 12 MW (second stage) was completed for the company EcoTES, Ivankiv, Kiev region, Ukraine. Assemblings works, start-up and commissioning were conducted for steam boilers, prodused by «HURST BOILER» (USA) with a capacity of 20 MW of thermal energy – operating pressure 38 bar, steam temperature 440 °C. Also, a steam turbine, produced by «Max-Watt» (India), has been installed and commissioned.